A bathroom is the only room in your house you deliberately fill with water every day. Almost everything that goes wrong in one comes down to waterproofing.

01 / A FINISHED JOB

Chester County
full bath renovation

Tiled walk-in shower with a picket pattern, marble hex floor, built-in bench and niche, custom vanity with a stone top, and a frameless sliding enclosure.

Completed bathroom renovation

The shower

Bench and niche are framed and waterproofed as part of the pan assembly, not added afterwards. The niche is set on a stud bay so it does not compromise anything structural.

The floor

Large format porcelain in the room, hex mosaic inside the shower. Small tile means more grout joints, which means more grip underfoot where you need it.

The details

Fixtures, valve and lighting placement are set at rough-in. Getting the sconce height right relative to the mirror is a decision made weeks before anyone sees a mirror.

02 / THE PART YOU NEVER SEE

Waterproofing is
the whole job

Tile is not waterproof. Grout is not waterproof. The assembly behind them is what keeps water out of your framing, and it is invisible the moment the tile goes on.

That is exactly why it gets skipped. A shower with a bad pan looks identical to a shower with a good one on the day it is finished. The difference shows up two years later as a stain on the ceiling below, and by then the fix means tearing all of it out.

  • Sloped pan built to drain, not flat with a hopeful drain
  • Waterproof membrane over the substrate, not just behind it
  • Corners and changes of plane detailed and sealed
  • Niches and benches waterproofed as part of the assembly
  • Flood tested before a single tile is set
Shower installation
03 / BEFORE AND AFTER

Same house, different hallway

Bathroom work rarely stops at the bathroom door. This upstairs hall and linen closet went in alongside a bath renovation on the same floor.

Hallway before Built in shelving after
Before
After

Scope creep, handled properly

Once the bathroom was open it made no sense to leave the adjoining hall unfinished. Doors were hung and cased, the linen closet was fitted with painted shelving, and the whole floor was finished as one job rather than two.

We priced the addition as a written change order before starting it, which is the only way additional work should ever happen on a renovation.

04 / WHAT WE BUILD

Powder rooms to primary suites

Powder rooms

Small, high impact, and the room every guest sees. Often the fastest meaningful upgrade in a house. Vanity, lighting, tile, paint and trim, usually inside two weeks.

Hall and guest baths

Tub-to-shower conversions, new tile surrounds, vanity and fixture replacement, ventilation corrected. Frequently the bathroom that has not been touched since the house was built.

Primary suites

Larger tiled showers, double vanities, freestanding tubs, heated floors, separate water closets. More trades, longer schedule, and worth doing properly.

01

Selections and layout

Fixture locations, tile, vanity and lighting confirmed before demolition.

02

Demolition

Down to studs and subfloor. This is when we find out what the previous work actually looks like.

03

Rough-in

Plumbing and electrical moved and set, framing corrected, blocking added for anything wall-mounted.

04

Waterproofing

Pan built, membrane applied, flood tested and verified.

05

Tile and finish

Tile set and grouted, vanity and top installed, fixtures fitted, paint and trim completed.

06 / QUESTIONS

Things people ask

How long does a bathroom take?
A powder room is often around two weeks. A full hall bath typically runs three to five weeks. A large primary suite can be longer, particularly if it involves moving walls.
Can you convert a tub to a walk-in shower?
Yes, and it is one of the most common requests we get. The drain usually needs to move and the floor framing may need attention, both of which we handle.
Do you do curbless or zero-entry showers?
Yes. They require the floor framing to be dropped or built up so the pan can slope properly, so it is a bigger job than a standard pan, but it is very doable in most houses.
Will my one bathroom be out of service the whole time?
If it is your only bathroom we will talk through that at the estimate and sequence the work to shorten the gap as far as possible.
Do you use a membrane system or a mud pan?
Both, depending on the layout and what the shower needs. What matters is that it is built as a system and flood tested, and we do that either way.